The team has been recognized as the best shipbuilding program in the Navy. Newport News Shipbuilding and Electric Boat each perform work on the reactor plant as well as alternate on the final assembly, test, outfit and delivery. Electric Boat builds the pressure hull, engine room and control room. Newport News Shipbuilding builds the stern, habitability & machinery spaces, torpedo room, sail and bow. Newport News Shipbuilding is teamed with General Dynamics Electric Boat to build Virginia-class submarines. Vertical Launch System Tomahawk Cruise Missiles,Ĭountermeasures: 1 internal launcher (reloadable 2-barrel) Vertical Tubes: 12 Vertical Launch System Tubes, Horizontal Tubes: Four 21" Torpedo Tubes, One secondary propulsion submerged motor. ![]() Improved Performance Machinery Program Phase III Specifications:Power Plant: One S9G pressurized water reactor,Ģ9.84MW (40,000hp), one shaft with pumpjet propulsor, Virginia Attack Submarine: The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 30 September 1998 and her keel was laid down on 2 September 1999.Ĭommissioned USS Virginia (SSN-774) 23 October 2004. Patch contributed by Mike Smolinski Virginia (SSN-774) Radio Call Sign: November - Victor - India - Romeo NavSource Online: Submarine Photo Archive ![]() Please take a moment to let us know so that we can correct any problems and make your visit as enjoyable and as informative as possible. ![]() Please report any broken links or trouble you might come across to the Webmaster.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |